Case Studies and Application Notes s Redesign of clients heater circuits to reduce upgrade costs (use smaller SCRs/thyristors)    PDF Document Using a PLC to integrate disparate and discrete devices, adding a plant-wide HMI and a ratio control application Upgrade existing Eurotherm control system hardware  and improve process control Upgrade a PC3000 and Wizcon SCADA with a T2750 and Eycon Laboratory fridge and freezer monitoring system Fan/drive belt mould curing control system SCADA for a sand /crude oil separation process Re-commissioning cable winding plant moved from Wales  to China De-commissioning and re-commissioning plastic extruder plant moved from The Netherlands to China De-commissioning and re-commissioning plastic extruder plant moved from Scotland to China Upgrade incinerator control and monitoring system to include SCADA and additional PLC I/O Upgrade plastic extrusion line to include a SCADA central operator station Existing modbus serial comms network upgraded to Ethernet TCP    PDF Document Serial to Ethernet comms converter limitation   PDF Document Reconfigure PC300 and replace a SCADA system with a panel mounted touchscreen HMI integrated control and monitoring systems go to paperless chart recorders go to instrumentation go to instrumentation go to instrumentation go to instrumentation go to instrumentation go to instrumentation go to instrumentation go to instrumentation Glass Lamination go to instrumentation